When do I need an structural permit?
|
| Safety first |
| For your safety, your family's safety, and
the safety of future occupants - and to avoid expensive mistakes
- do not perform any electrical work that is beyond your skill
level. |
|
|
| When do I need a building (structural) permit? |
| What can I do without a permit? |
| Where do I get a permit? |
| What information will I need to get a permit? |
| Who must review my project? |
| Who gets the permit? |
| How long does it take to get a permit? |
| When can work start? |
| How do I get an inspection? |
| Things to do |
| |
| When do I need
a building (structural) permit? |
|
A permit is required to construct, enlarge, alter, move or demolish any
one- or two-family dwelling or related structure.
For example:
- add a room
- build, move, or in some cases demolish a carport, garage, or shed
of more than 200 square feet
- finish an attic, garage, or basement to make additional living space
- cut a new window or door opening, or widen existing openings
- move, remove, or add walls
- apply roofing when all of the old roofing is removed and new sheathing
is installed
- build a stairway
- build a retaining wall more than four feet high
- build a deck more than 30 inches above grade
- put up a fence more than six feet high
If you are not sure you need a permit, call the building department responsible
for your area.
|
| Back to top |
| |
| What can I
do without a permit? |
|
You do not need a permit to do the following minor repairs and maintenance
on a one- or two-family dwelling:
- paint buildings that are not historic landmarks
- blow insulation into existing homes
- put up storm windows
- install window awnings not more than 54 inches deep (and not in a
design zone) that are supported by an exterior wall and do not project
beyond the property line
- replace interior wall, floor, or ceiling covering, such as wallboard
or sheet vinyl
- put up shelving and cabinets
- install gutters and downspouts (a plumbing permit may still be required
for stormwater disposal)
- replace or repair siding on a wall that is three feet or more from
a property line
- replace or repair as much as two layers of roofing, if there is no
replacement of sheathing
- replace doors or windows if the existing openings aren't widened
- build a fence up to 6 feet high
- pave a walkway
- build a patio or deck that is not more than 30 inches above grade
Being exempt from a permit does not mean that you can do work that would
violate any law or ordinance. Code standards must be met, even when a
permit is not required.
|
| Back to top |
| |
| Where
do I get a permit? |
| Homeowners must apply for a permit at the building department that has
jurisdiction over their city or county. To find your jurisdiction, call
your nearest city hall and ask what building jurisdiction you should contact
for your permit. Be sure to mention your address and the type of work you
are planning. |
| Back to top |
| |
| What
information will I need to get a permit? |
1. The address and for some building depart-ments a legal description
of the property.
2. A description of the work proposed.
3. The owner's name, address, fax number, e-mail address, and phone number.
4. If a contractor is doing the work, the contractor's name, address, phone
number, and state license number.
5. More then one set of plans for new construction or remodeling of homes.
Check with your building department to find out the exact number of copies
required. The plans must clearly show all work on the building and where
the building sits on the property. Typical plans include a site plan, floor
plans, and cross sections showing construction details.
6. Three sets of plans for large commercial construction (anything more
than 4,000 square feet or 20 feet in height) and/or A, E, and I occupancies.
For all other commercial projects, submit two sets of plans. |
| Back to top |
| |
| Who
must review my project? |
| An Oregon-certified plans examiner will review your plans to ensure the
proposed project meets the requirements of the One-and Two-Family Dwelling
Specialty Code. If additional information or changes are necessary, you
will be contacted by phone or mail and asked to furnish the information. |
| Back to top |
| |
| Who
gets the permit? |
| As the owner of a one- or two-family dwelling, you can hire a contractor
registered by the Construction Contractors Board or you can get the permit
and do the work yourself. An immediate family member, a friend, neighbor,
tenant, or other relative can legally work on your one- or two-family dwelling
only if the work is not for compensation. |
| Back to top |
| |
| How
long does it take to get a permit? |
|
A plan review generally takes up to two weeks for one- and two-family
dwellings. Time frames can change, depending on the complexity of the
project and the completeness of the information you submit with your application.
When you submit your plans, you will be asked to pay the plan review
fee. You may also pay the structural permit fee at that time or when the
permit is issued.
When your plans have been reviewed, stamped "approved" and
signed, one set will be returned to you with your permit.
|
| Back to top |
| |
| When
can work start? |
When your permit has been issued and one set of your approved plans returned,
work can begin. The permit and plans must be on the job site and available
to the inspector.
To change your plans from what was originally approved, you must show the
changes on two additional sets of plans and take them to the Building Codes
Division field office or the building department responsible for your area.
Do not mark the approved set. If there are changes to the plans after they
have been issued, additional fees may apply. |
| Back to top |
| |
| How do I get
an inspection? |
|
Any work done under a permit must be inspected by a certified inspector.
You may call the inspection request line at the building department in
your area within 24 hours of completion of any phase of the project. A
minimum of 24 hours' notice is usually required for inspections.
When you call, you will be asked for the permit number, homeowner's name,
project address, type of inspection needed, and date on which inspection
is desired. Be prepared to furnish detailed directions to the job site.
Unless all of the work is outside and accessible, an adult needs to be
at the site to provide access for the inspector.
|
| Back to top |
| |
| Things to do |
|
Be an informed consumer when buying a product or contracting a service:
1. Call the Building Codes Division or the Construction Contractors Board
to verify active license and/or registration.
2. Call the Better Business Bureau.
3. Talk to other consumers.
4. Compare prices.
5. Ask for references and contact them.
6. Be sure you have a written contract and read it carefully before signing.
|